There will be work done on US-2 in Schoolcraft County, starting on Monday.
The Michigan Department of Transportation (MDOT) is investing about $2.6 million to mill and resurface 10.3 miles of US-2 from Gulliver to 1 mile east of the US-2/M-77 intersection in Schoolcraft County.
This project includes a three-year pavement warranty. It is expected to wrap up around June 21st.
Project map: https://bit.ly/2vt9mdJ
The work will require lane closures with traffic shifts and flag control. An 11-foot lane width restriction will be in effect for this project. This project will result in a smoother driving surface and increased safety, and will extend the lifespan of the roadway.















